Investing in the I-290 Corridor
Below is a map of funded and completed I-290 Corridor Projects and investments from IDOT – Rebuild Illinois.
Current I-290 News
New National Report Ranks I-294/I-290/I-88 Interchange as Most Congested Freight Bottleneck in the U.S.
New national data shows the interchange of Interstate 294 and Interstates 290/88 in the Chicago region is now the most congested freight interchange in the United States, underscoring the urgent need to advance the I-290 Blue Line Reconstruction Project. This project is widely considered the most important transportation project in Illinois.
Chicago’s I-294 interchange takes over as nation’s worst freight bottleneck
The interchange of Interstate 294 and Interstates 290/88 in Chicago has dethroned the George Washington Bridge interchange of I-95 at SR 4 in Fort Lee, New Jersey, as the most congested freight bottleneck in the U.S., according to the American Transportation Research Institute’s annual Top Truck Bottleneck List.
Granite wins IDOT’s first-ever CM/GC contract for$350 million I-290 drainage project
Granite Construction has been selected by the Illinois Department of Transportation (IDOT)for a construction manager/general contractor contract to for the I-290 drainageimprovements project in Chicago — IDOT’s first-ever CM/GC project.
Granite to build $350 million I-290 drainage, sewer upgrade inChicago
The Illinois Department of Transportation (IDOT) has selected Granite for its first ConstructionManager/General Contractor (CM/GC) contract, advancing a $350 million stormwater and drainage improvementproject along the I-290 corridor in Chicago.

